This project was a resurface of a car park using hot bitumen tar surfacing and embedded gravel coating.
Stage 1: Cleaning all loose surfacing and removing all debris and weeds.
![Cleaning all loose surfacing and removing all debris and weeds.](http://dandllandscapes.co.uk/wp-content/uploads/2013/09/CNV00012-1024x685.jpg)
Stage 2: Laying 6 inch base course.
![Laying type one, 6 inch base course.](http://dandllandscapes.co.uk/wp-content/uploads/2013/09/CNV00009-1024x685.jpg)
Stage 3: Machine rolling the base course readying for top coating.
![Machine rolling the base course reading for top coating.](http://dandllandscapes.co.uk/wp-content/uploads/2013/09/CNV00008-1024x685.jpg)
Stage 4: Laying hot bitumen tar and embedding the pea shingle.
![Laying hot bitumen tar and embedding the pea shingle.](http://dandllandscapes.co.uk/wp-content/uploads/2013/09/CNV00006-1024x685.jpg)
Stage 5: Completed car park project for the use of light and heavy vehicles.
![Completed car park project for the use of light and heavy vehicles.](http://dandllandscapes.co.uk/wp-content/uploads/2013/09/CNV00003-1024x685.jpg)