Before driveway replacement.Before driveway replacement.Removal of old gravel driveway, weeds and moss.Installing an even base course of tarmac before shingle application.Finished job showing replacement gravel driveway.Finished job showing replacement gravel driveway.
Old gates need replacement.Removal of paving slabs.Removal of all loose surface material in preparation for new car parking area.Making a trench and laying pipes for new drainage system.After slab removal, installing a concrete base with brick edging.Hot bitumen tar and pea shingle surface for courtyard area.Spraying hot bitumen, readying for shingle application.Completed courtyard area.Finished car park area with new gated entrance for courtyard.
Large Eucalyptus tree needing removal.Chainsawing tree into manageable sizes.Finishing the job, cutting down stump to ground level to be drilled and poisoned.
Old driveway and lawn area to be replaced.Digging out old lawn and driveway.Adding membrane and base course layer.Adding bitumen tar to hold pea shingle.Completed driveway with embedded peashingle in bitumen