Category Archives: Tree & Garden Work

Creation of child friendly play area.

Stage 1: Remove all unwanted garden structures to create a child friendly garden.

Remove all unwanted garden structures to create a child friendly garden.
Remove all unwanted garden structures to create a child friendly garden.

Stage 2: Installing paving slabs for new garden structures.

Installing paving slabs for new garden structures.
Installing paving slabs for new garden structures.

Stage 3: After removal of old lawn and flower beds, we installed new top soil and garden turf.

After removal of old lawn and flower beds, we installed new top soil and garden turf.
After removal of old lawn and flower beds, we installed new top soil and garden turf.

Stage 4: Completed garden project.

Completed garden project.
Completed garden project.

Stage 5: Cleaned and repaired patio and wall.

Cleaned and repaired patio and wall.
Cleaned and repaired patio and wall.

 

Replacement of old fence.

Stage 1: After removal of old fence, preparing for erection of new close boarded fence panels.

After removal of old fence, preparing for erection of new close boarded fence panels.
After removal of old fence, preparing for erection of new close boarded fence panels.

Stage 2: Measuring and creating fence boundary.

Measuring and creating fence boundary.
Measuring and creating fence boundary.

Stage 3: Corrected new fence, prepare for clearance of old panels and other garden waste.

Corrected new fence, prepare for clearance of old panels and other garden waste.
Corrected new fence, prepare for clearance of old panels and other garden waste.

Stage 4: Alignment of fence panels after installing fence posts in secure concrete.

Alignment of fence panels after installing fence posts in secure concrete.
Alignment of fence panels after installing fence posts in secure concrete.

Stage 5: Fence installation complete.

Fence installation complete.
Fence installation complete.

 

New Picket Fence Project

Stage 1: Cleared shrubbery and prepared area by adding weed protective membrane and new top soil.

Cleared shrubbery and prepared area by adding weed protective membrane and new top soil.
Cleared shrubbery and prepared area by adding weed protective membrane and new top soil.

Stage 2: Installation of new picket fence using concrete posts and gravel boards.

Installation of new picket fence using concrete posts and gravel boards.
Installation of new picket fence using concrete posts and gravel boards.

Garden Raised Bed Project

Stage 1: Cleared the garden and old flower beds. Installed weed suppressing membrane. Built hard wood low-maintenance raised beds.

Cleared the garden and old flower beds.  Installed weed suppressing membrane. Built hard wood low-maintenance raised beds.
Cleared the garden and old flower beds. Installed weed suppressing membrane. Built hard wood low-maintenance raised beds.

Stage 2: Assembling raised bed boxes.

Assembling raised bed boxes.
Assembling raised bed boxes.

Stage 3: Filled beds with top soil and installed pathway with pea shingle gravel.

Filled beds with top soil and installed pathway with pea shingle gravel.
Filled beds with top soil and installed pathway with pea shingle gravel.