Stage 1: Before job, need to remove hedge, old gravel and slabs.
![Before job, need to remove hedge, old gravel and slabs.](http://dandllandscapes.co.uk/wp-content/uploads/2013/10/SAM_1324.jpg)
Stage 2: After removal of old garden rubble and waste, we installed new paving slabs and replaced old gravel using 10mm washed pea shingle over a weed protective membrane.
![After removal of old garden rubble and waste, we installed new paving slabs and replaced old gravel using 10mm washed pea shingle.](http://dandllandscapes.co.uk/wp-content/uploads/2013/10/SAM_1326.jpg)
Stage 3: Job completion of new fence with gravel front garden and paving slab pathway.
![Job completion of new fence with gravel front garden and paving slab pathway.](http://dandllandscapes.co.uk/wp-content/uploads/2013/10/SAM_1327.jpg)