All posts by dandllan

Installation of gravel front garden with fence and paving slab pathway project.

Stage 1: Before job, need to remove hedge, old gravel and slabs.

Before job, need to remove hedge, old gravel and slabs.
Before job, need to remove hedge, old gravel and slabs.

Stage 2: After removal of old garden rubble and waste, we installed new paving slabs and replaced old gravel using 10mm washed pea shingle over a weed protective membrane.

After removal of old garden rubble and waste, we installed new paving slabs and replaced old gravel using 10mm washed pea shingle.
After removal of old garden rubble and waste, we installed new paving slabs and replaced old gravel using 10mm washed pea shingle.

Stage 3:  Job completion of new fence with gravel front garden and paving slab pathway.

Job completion of new fence with gravel front garden and paving slab pathway.
Job completion of new fence with gravel front garden and paving slab pathway.

New Picket Fence Project

Stage 1: Cleared shrubbery and prepared area by adding weed protective membrane and new top soil.

Cleared shrubbery and prepared area by adding weed protective membrane and new top soil.
Cleared shrubbery and prepared area by adding weed protective membrane and new top soil.

Stage 2: Installation of new picket fence using concrete posts and gravel boards.

Installation of new picket fence using concrete posts and gravel boards.
Installation of new picket fence using concrete posts and gravel boards.

Resurface Tarmac Driveway

Stage 1: Removed old tarmac. Prepping of driveway for resurface project.

Removed old tarmac. Prepping of driveway for resurface project.
Removed old tarmac. Prepping of driveway for resurface project.

Stage 2: Resurfaced drive with new tarmacadam incorporating white granite chippings.

Resurfaced drive with new tarmacadam incorporating white granite chippings.
Resurfaced drive with new tarmacadam incorporating white granite chippings.

 

Garden Raised Bed Project

Stage 1: Cleared the garden and old flower beds. Installed weed suppressing membrane. Built hard wood low-maintenance raised beds.

Cleared the garden and old flower beds.  Installed weed suppressing membrane. Built hard wood low-maintenance raised beds.
Cleared the garden and old flower beds. Installed weed suppressing membrane. Built hard wood low-maintenance raised beds.

Stage 2: Assembling raised bed boxes.

Assembling raised bed boxes.
Assembling raised bed boxes.

Stage 3: Filled beds with top soil and installed pathway with pea shingle gravel.

Filled beds with top soil and installed pathway with pea shingle gravel.
Filled beds with top soil and installed pathway with pea shingle gravel.

Driveway Project

This project was a resurface of a car park using hot bitumen tar surfacing and embedded gravel coating.

Stage 1: Cleaning all loose surfacing and removing all debris and weeds.

Cleaning all loose surfacing and removing all debris and weeds.
Cleaning all loose surfacing and removing all debris and weeds.

Stage 2: Laying  6 inch base course.

Laying type one, 6 inch base course.
Laying type one, 6 inch base course.

Stage 3: Machine rolling the base course readying for top coating.

Machine rolling the base course reading for top coating.
Machine rolling the base course reading for top coating.

Stage 4: Laying hot bitumen tar and embedding the pea shingle.

Laying hot bitumen tar and embedding the pea shingle.
Laying hot bitumen tar and embedding the pea shingle.

Stage 5: Completed car park project for the use of light and heavy vehicles.

Completed car park project for the use of light and heavy vehicles.
Completed car park project for the use of light and heavy vehicles.